Procedure of Construction

There are six key stages within the procedure of construction:

Stage 1: Base stage

Site start with set out. Excavation of site where required. Underslab drains laid and concrete slab poured. Base Stage complete.

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.

Note:

  • Site supervisor will make an introduction call to you.

Stage 2: Frame stage

  • Frame constructed, roof trusses installed.
  • Frame stage complete.

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.

Note:

  • Site supervisor can be contacted to arrange a site meeting (if required).

Stage 3: Brickwork stage

  • Plumbing rough ins completed.
  • Brickwork completed.
  • Brickwork stage complete.

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.

Note:

  • Site supervisor can be contacted to arrange a site meeting (if required).

Stage 4: Lock up stage

  • Roof tiles installed.
  • Statutory authority inspection complete.

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.

tyrells
Tyrell’s independent quality inspection.

Note:

  • Site supervisor can be contacted to arrange a site meeting (if required).

Stage 5: Commencement of linings

  • Electrical, security, ducted vacuum and air conditioning ductwork (if applicable) rough ins completed. Wall insulation installed (if applicable).

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.

Stage 6: Practical completion stage

  • Painting, wall and floor tiling complete. All electrical, plumbing, heating and vacuum systems fitted off. Shower screens, mirrors and splashbacks installed. Door furniture, robe rails etc. to be installed.

Client requirements:

  • Progress payment to be authorised by client and forwarded to lending institution for payment within 7 days.
  • Bank requirements at settlement will need to be met for funds to be released. You will need to contact your lender for further details.

tyrells
Tyrell’s independent quality inspection.

Note:

  • Site supervisor will contact you to arrange practical completion inspection.

Stage 7: Settlement

  • Practical completion inspection of your new home to be carried out. Settlement of your new home will be within 7 days.

Client requirements:

  • Owner to inspect home with an Eden Brae Homes representative. Final payment to be paid at settlement by bank cheque or cash only.

tyrells
Tyrell’s independent quality inspection certificate provided.